60 in 60 – Stairways, Doors, Windows and more work…
60 in Sixty,
June 22, 2011
We had a small but productive group at the Cosby house today. We were able to install the pull down attic stairway. We cut and rough in the opening for the interior double French doors from living room to breakfast room (porch room).
Install the 2 smaller windows (opening already prepped for the windows) in bathroom and kitchen. We are hoping for rain so we decided to think positive about rain. We removed some dry wall and framing in the back bathroom in preparation for framing the new closet and utility room.
City of Houston came and removed all the 8 high wall of tree debris, lumber, bags of drywall etc from the front of lot. Pictures will tell a better story.
Saturday- June 25- 8am - List for Saturday (Complete as much as time permits)
- Finish installing 3 windows in breakfast/porch room
- Frame back bath room wall, utility room, and closet in adjoining bedroom.
- Cut and rough in 60″ opening for bi-fold doors for utility room.
- Frame in relocated door opening into back bedroom from breakfast room/porch room.
- Break out tile in kitchen and front bathroom.
If you forgot to Sign in when you worked, please do here!
Sign-up on this form to receive updates on the Cosby Street house remodeling.
Cosby Project
-
We’re done…almost!!
6 Sep 2011
-
60 in 60 – Stairways, Doors, Windows and more work…
22 Jun 2011
-
60 in 60 – Windows, Tiles, Trash, etc…
21 Jun 2011
-
We’re done…almost!!
- Calendar



![60in60[1]](http://agapedevelopment.org/wp-content/uploads/2011/06/60in6011-300x213.jpg)