60 in 60 (Sixty volunteers completing the job in Sixty days)

We have had lots of work done in the last 2 weeks. We got base plates and studs replaced along the east wall. The exterior wall were insulated from the inside this last weekend by a SS class (Act 2).

The week ahead:

We need roof to be replaced this Wednesday by pros, new windows in town and the installation will begin Saturday. So any folks able to work on Saturday will be appreciated. We also need to have floors scraped in hall bathroom.

Coming soon:

Pull down stairway to be installed in hallway, fumigate the attic for roaches after windows installed, some electrical troubleshooting in attic and ground wire connections, remove tile floor in kitchen, Kitchen design, cabinet placements etc (suggestions welcome) and install drywall

Materials- Connections- Networks

We will be purchasing some drywall for the house- if anyone has connections for a discount on or donated dry wall and supplies- 45 sheets 4 x 8 x 1/2 in approximately.

We are considering residing the house with Hardi plank- any connections on Hardi siding!

Thanks for all the hard work and great attitude you all have displayed so far in our project.

Stay Tuned!

Click for more pictures!

If you forgot to Sign in when you worked, please do here!

Sign-up on this form to receive updates on the Cosby Street house remodeling.

 

Leave a Reply

Your email address will not be published. Required fields are marked *

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>